Hi everyone,
The wait for our new Tig is almost over... almost
Tilly Tig (don't blame me for the name! The kids had a role in naming her AND its ganna be the Mrs' car) has finally reached port and is currently sitting on the dock waiting on Customs to give it the once over.
Pending Customs release time frames and however many extra days my dealer needs to get it ready, we'll be able to receive delivery of the new 125 TSI baby (Yes, I'm a very proud father).
Looking forward to picking it up, to say the least.
Thanks to the great info found in this forum regarding pickup, detailing and car care, Tilly already has a check list to meet for the initial collection and a 'bath' planned for when she gets home. Again, thanks to posts & info by DMS & Team_V, I've hit up Car Care Products and gotten everything I need to give the Tigs paint job that first layer of protection.
Procedure will involve an initial spray down with a high pressure hose, two bucket cleaning method using Dodo Juice pH Neutral Maintenance Shampoo with a Microfibre Multi Purpose Mitt, followed by a clay using the Mint Grey Clay Bar Kit, dry down with a Waffle Weave Microfibre Drying Towel and then to finish off with the Nanolex Premium Spray Sealant. That should only take me about two days...
Following that, I've got a couple of little custom cosmetic mods to attach. Remember spokey dokeys!? Well I couldn't find any to fit the rims, so I had to go with something else instead
Lots of other plans in motion and I haven't even picked it up yet, though the idea is to spread them out a bit (have to at least wait for the engine to be run in for stage 1)
So far on the to do list (probably in this order):
And then after that, the wish list; which includes:
Also recently found on the APR site that they are doing a K04 Conversion System for the Tig...
The list keeps on growing
Once we pick it up I'll post some photo's (as soon as i work out how)
The wait for our new Tig is almost over... almost
Tilly Tig (don't blame me for the name! The kids had a role in naming her AND its ganna be the Mrs' car) has finally reached port and is currently sitting on the dock waiting on Customs to give it the once over.
Pending Customs release time frames and however many extra days my dealer needs to get it ready, we'll be able to receive delivery of the new 125 TSI baby (Yes, I'm a very proud father).
Looking forward to picking it up, to say the least.
Thanks to the great info found in this forum regarding pickup, detailing and car care, Tilly already has a check list to meet for the initial collection and a 'bath' planned for when she gets home. Again, thanks to posts & info by DMS & Team_V, I've hit up Car Care Products and gotten everything I need to give the Tigs paint job that first layer of protection.
Procedure will involve an initial spray down with a high pressure hose, two bucket cleaning method using Dodo Juice pH Neutral Maintenance Shampoo with a Microfibre Multi Purpose Mitt, followed by a clay using the Mint Grey Clay Bar Kit, dry down with a Waffle Weave Microfibre Drying Towel and then to finish off with the Nanolex Premium Spray Sealant. That should only take me about two days...
Following that, I've got a couple of little custom cosmetic mods to attach. Remember spokey dokeys!? Well I couldn't find any to fit the rims, so I had to go with something else instead

Lots of other plans in motion and I haven't even picked it up yet, though the idea is to spread them out a bit (have to at least wait for the engine to be run in for stage 1)
So far on the to do list (probably in this order):
- Window Tint
- RNS510
- APR ECU Upgrade
- Cold Air intake
- Rear Sway Bar
And then after that, the wish list; which includes:
- H&R Springs
- Downpipe
- Haldex Performance Controller (still um'ing and ah'ing about this one)
Also recently found on the APR site that they are doing a K04 Conversion System for the Tig...
The list keeps on growing

Once we pick it up I'll post some photo's (as soon as i work out how)

Comment