Above Forum Ad

Collapse

Announcement

Collapse

Email Notifications Failing (mostly Telstra)

Hello everyone. Seems there is an issue with Telstra (possible others) blocking email from our server. If you are trying to sign up I would suggest a different email if possible. If you're trying to reset your password and it fails please use the Contact Us page:
See more
See less

New Octavia ....when? How Much?

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Let me clarify, it was the panel beaters fault, not Skoda. In fact I bought an Octavia when the Superb went. The P/B bought parts, discovered he didn't have everything then bought more and so on for 8 months. This was confirmed through the dealer and Skoda OZ. Then he managed to cock up the repair, bought the car off me and still needed to buy more parts. But, the lesson is, if you need repairs done go to where the dealers get theirs repaired, or at least ensure the P/B know what they are doing.
    2012 MY11 Cappuccino Superb Elegance, TDI. (Gone)
    2014 MY14 Race Blue Octavia Ambition Plus wagon, TSI, Tech Pack. (Wife's)
    2014 MY14 Cappuccino Octavia Elegance hatch, TDI, Sunroof, Tech Pack, Towbar. (Gone)
    2017 MY18 Lava Blue Superb wagon, 162 TSI, Sunroof, Tech Pack, Comfort Pack, Cream Leather, Towbar (Mine)

    Comment


    • Originally posted by ddre78 View Post
      Dropped into a Skoda dealership today to get some info on the vRS. This car was probably at the top of my list but when quoted Dec delivery for a Wagon or July+ for Sedan (Im after a sedan), all I could do was laugh and leave. Very disappointing that a brand trying to build itself here would put potential customers through such crazy wait times. Im simply not prepared to wait that long, so ill have to look elsewhere.
      a) What on earth makes you think that Skoda is a brand trying to build itself here? They've had 7 years to extract the digit & not too much has changed. I'm one of the early adopters & they haven't done themselves any favours (or more to the point, VWA haven't).

      b) Dec delivery on the wagon sounds reasonable based on everyone elses wait times (inc those in the UK). July+ for the less popular sedan? WTF?
      carandimage The place where Off-Topic is On-Topic
      I used to think I was anal-retentive until I started getting involved in car forums

      Comment


      • No way is December reasonable for delivery. Wagon is more popular than sedan (numbers would be other way around).
        Plan on 7-8 months for delivery for any rs. My ambition+ will be ~7 months from order to delivery.
        2014 Skoda Ambition Plus 103TSI candy white wagon, 6sp Manual, Tech pack, Panoramic Sunroof, 18's, Colour Maxidot, Comfort BT
        Ordered 07 May 14 (Wk 15), Built Wk 37, Loaded 27/9 (wk 39), Docked 12/11 (wk 46), DELIVERED! 12/12 (end of wk 50 - 7 months + 1 week).

        Comment


        • Originally posted by Stiv View Post
          I asked the brighton dealer today and hoping someone here may shed some light as it's a concern if I purchase. I asked if my girl stacks the car and needs a new bumper and parts to fix, (most likely be me) how long will parts take to arrive....he said a couple weeks. But how can this be? If it takes months to get a car here at this stage, how can they afford to send parts when they don't have enough to finish off the builds that are back ordered. Reality is that these things do occur, Does anyone else have this concern?
          Unless "your girl" drives the car 100%, what makes her more likely to crash than you?

          Skoda piggybacks off VWs parts logistics. They have a hub in Singapore that distributes througout the Asia Pacific region (or is that Renault?). Spare parts are handled differently from build parts (packed, labelled, etc) and I believe a lot of the production delays are due to a small number of specific parts (RVC, sunroofs, etc). Keep in mind that Australia up-specs it's vehicles compared to other markets such as the UK.

          I do think if you own a niche brand you'll be waiting a while if your car visits the panel beater. Best take out the extended rental car coverage on your insurance.

          Also, AUS is a small market so I don't think they give us a lot of priority - hence our big wait times. They are building ~30,000 Octavias per month at the moment. AUS is selling maybe 0.5% of them.



          Factories are back at work & have been upgraded so maybe the times will tighten up?

          carandimage The place where Off-Topic is On-Topic
          I used to think I was anal-retentive until I started getting involved in car forums

          Comment


          • Originally posted by GTR27 View Post
            No way is December reasonable for delivery. Wagon is more popular than sedan (numbers would be other way around).
            Plan on 7-8 months for delivery for any rs. My ambition+ will be ~7 months from order to delivery.
            What I mean is that most people here would be pretty happy if they ordered their wagon now & it came in December.
            carandimage The place where Off-Topic is On-Topic
            I used to think I was anal-retentive until I started getting involved in car forums

            Comment


            • Originally posted by brad View Post
              What I mean is that most people here would be pretty happy if they ordered their wagon now & it came in December.
              Hell yes. If that happened, they should buy a lotto ticket!
              2014 Skoda Ambition Plus 103TSI candy white wagon, 6sp Manual, Tech pack, Panoramic Sunroof, 18's, Colour Maxidot, Comfort BT
              Ordered 07 May 14 (Wk 15), Built Wk 37, Loaded 27/9 (wk 39), Docked 12/11 (wk 46), DELIVERED! 12/12 (end of wk 50 - 7 months + 1 week).

              Comment


              • July+ I find odd for a sedan, I have been told 6mths is average. Some of the bigger dealers are pushing to have their stock allowances increased and so they should. They were promised if they brought the orders they would get bigger allocations and it hasn't happened, if it does things would change quite quickly. I really get the idea VWA are standing on a few hands to stop the floods that would otherwise happen in orders.

                Comment


                • [QUOTE=brad;1078955]Unless "your girl" drives the car 100%, what makes her more likely to crash than you?

                  Purchasing the car for her. me as an occasional driver and going by her previous incidents, ie she ripped her rear bumper off last month reversing, previously drove into a letter box reversing, (which is why I need to get her a rear camera lol) and also drove my previous new cars front lip into a ditch on day one of ownership. Apart from that she's awesome.

                  Comment


                  • Just got a call from the dealer highlighting that my car will be built in September for a January 2015 arrival date. Certainly meets that 6-7 month wait time!
                    2014 Skoda Octavia vRS Wagon (MY15) | Candy White | 2.0L 4cyl Turbo MT | 162Kw 350Nm | Tech Pack | 18" Black Pack | Auto Tailgate |

                    Comment


                    • [QUOTE=Stiv;1078995]
                      Originally posted by brad View Post
                      Unless "your girl" drives the car 100%, what makes her more likely to crash than you?

                      Purchasing the car for her. me as an occasional driver and going by her previous incidents, ie she ripped her rear bumper off last month reversing, previously drove into a letter box reversing, (which is why I need to get her a rear camera lol) and also drove my previous new cars front lip into a ditch on day one of ownership. Apart from that she's awesome.
                      Sounds like a keeper
                      carandimage The place where Off-Topic is On-Topic
                      I used to think I was anal-retentive until I started getting involved in car forums

                      Comment


                      • Just got my call from the dealer. He says my RS will be built as part of a batch in mid Oct with an ETA of late Jan or early Feb in Oz. Wouldn't/couldn't give a build week. It's a wagon with the tech pack ordered 2 July. Hopefully the boat tracking phase will start in the not too distant future.

                        Comment


                        • Originally posted by Ubolt View Post
                          Just got a call from the dealer highlighting that my car will be built in September for a January 2015 arrival date. Certainly meets that 6-7 month wait time!
                          Wouldn't want to be Jan delivery if it's built in September. Mine is due for sept 22 build (wk39) and I'm expecting it early/mid Dec......

                          Would be very, very upset if it got pushed back to Jan delivery.... 8 months for an ambition plus in that scenario....
                          2014 Skoda Ambition Plus 103TSI candy white wagon, 6sp Manual, Tech pack, Panoramic Sunroof, 18's, Colour Maxidot, Comfort BT
                          Ordered 07 May 14 (Wk 15), Built Wk 37, Loaded 27/9 (wk 39), Docked 12/11 (wk 46), DELIVERED! 12/12 (end of wk 50 - 7 months + 1 week).

                          Comment


                          • Originally posted by GTR27 View Post
                            Wouldn't want to be Jan delivery if it's built in September. Mine is due for sept 22 build (wk39) and I'm expecting it early/mid Dec......

                            Would be very, very upset if it got pushed back to Jan delivery.... 8 months for an ambition plus in that scenario....
                            Under-promise / Overdeliver.

                            Dealer is probably waiting until it's on the ocean then pull back the ETD. It's what I'd do.
                            carandimage The place where Off-Topic is On-Topic
                            I used to think I was anal-retentive until I started getting involved in car forums

                            Comment


                            • Originally posted by brad View Post
                              Under-promise / Overdeliver.

                              Dealer is probably waiting until it's on the ocean then pull back the ETD. It's what I'd do.
                              I'm still hoping build week comes forward a bit..... Mine is only a provisional build week.
                              2014 Skoda Ambition Plus 103TSI candy white wagon, 6sp Manual, Tech pack, Panoramic Sunroof, 18's, Colour Maxidot, Comfort BT
                              Ordered 07 May 14 (Wk 15), Built Wk 37, Loaded 27/9 (wk 39), Docked 12/11 (wk 46), DELIVERED! 12/12 (end of wk 50 - 7 months + 1 week).

                              Comment


                              • Car is being unloaded at Port Kembla as we speak......slightly nervous and excited. I can almost taste that new car smell.

                                Comment

                                Working...
                                X