If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed, registering will remove the in post advertisements. To start viewing messages,
select the forum that you want to visit from the selection below.
This means you should apply for your renewal now to avoid any disruptions to your membership whilst the renewal process is taking place! NOTE: If you have an auto renewing subscription this will happen automatically.
Above Forum Ad
Collapse
Announcement
Collapse
Email Notifications Failing (mostly Telstra)
Hello everyone. Seems there is an issue with Telstra (possible others) blocking email from our server. If you are trying to sign up I would suggest a different email if possible. If you're trying to reset your password and it fails please use the Contact Us page:
Got an update from the dealer on mine this week. Ordered it wk45, now scheduled for build mid Jan. He said their last boat only took 4 weeks... seems strange that the time on the water can be so variable but I guess I haven't a clue about what variables there are.. does it just depend what else is on the boat and where it's going?
Brisbane was the 10th stop for mine, and each stop was effectively 2 days - getting tugged into port, docking, then unloading, pilot ship back out. So more stops = more time. At 2 days a hit, mine took effectively 18 days extra over a direct ship. Actual shipping time was just over a month (about 5-6 weeks) so 4 weeks is easily do-able.
2014 Skoda Ambition Plus 103TSI candy white wagon, 6sp Manual, Tech pack, Panoramic Sunroof, 18's, Colour Maxidot, Comfort BT
Ordered 07 May 14 (Wk 15), Built Wk 37, Loaded 27/9 (wk 39), Docked 12/11 (wk 46), DELIVERED! 12/12 (end of wk 50 - 7 months + 1 week).
Yep... On everything built from wk45 is what the dealer told me.. Someone else around here posted a scan of the page with the new kit back then (a lot more concise than trying to decipher all those dots in the brochure).
Got an update from the dealer on mine this week. Ordered it wk45, now scheduled for build mid Jan. He said their last boat only took 4 weeks... seems strange that the time on the water can be so variable but I guess I haven't a clue about what variables there are.. does it just depend what else is on the boat and where it's going?
Nick
Mine was built week 48 and not yet on a boat. Don't forget the reality bus.
The Octavia has been eliminated in round one of this year's Wheels COTY citing the poor ride, poor equipment levels and the acoustic boom. Bit of a shame given that on paper it should have been everything last year's winner has (Mk7 Golf), and more.
Wheels assesses the range as a whole, whereas Drive seems to have focused on one particular spec.
The issues with spec were directed at the Ambition model, having missed out on cruise control, centre arm rest and rear vents when compared with the cheaper Golf.
The Mazda 6 was released early last year so would not have been included.
Comment